Skip to content

v0.8.41: library, coda connector, connector sync engine hardening #31870

v0.8.41: library, coda connector, connector sync engine hardening

v0.8.41: library, coda connector, connector sync engine hardening #31870

Triggered via pull request September 17, 2026 08:19
@waleedlatif1waleedlatif1
synchronize #7922
staging
Status Cancelled
Total duration 30s
Artifacts

ci.yml

on: pull_request
Detect Version
Detect Version
Detect Desktop Changes
Detect Desktop Changes
Prepare Trigger.dev
Prepare Trigger.dev
Matrix: Build AMD64
Matrix: Build Dev ECR
Matrix: Build ARM64 (GHCR Only)
Matrix: Test and Build / oauth-postgres
Matrix: Test and Build / test-shard
Test and Build  /  Lint and Test
15s
Test and Build / Lint and Test
Test and Build  /  Build App
13s
Test and Build / Build App
Check Docs Changes
Check Docs Changes
Migrate Dev DB  /  Apply Database Migrations
Migrate Dev DB / Apply Database Migrations
Check Desktop Signing Secrets
0s
Check Desktop Signing Secrets
Migrate DB  /  Apply Database Migrations
Migrate DB / Apply Database Migrations
Create Desktop Prerelease
0s
Create Desktop Prerelease
Promote Images
Promote Images
Desktop Prerelease Build  /  Build, Sign, Notarize
Desktop Prerelease Build / Build, Sign, Notarize
Matrix: Create GHCR Manifests
Process Docs  /  Process Documentation Embeddings
Process Docs / Process Documentation Embeddings
Promote Trigger.dev
Promote Trigger.dev
Publish Desktop Prerelease
0s
Publish Desktop Prerelease
Resolve Attestation Subjects
0s
Resolve Attestation Subjects
Prune Desktop Prereleases
0s
Prune Desktop Prereleases
Matrix: Attest Images
Create GitHub Release
0s
Create GitHub Release
Desktop Release  /  Build, Sign, Notarize
Desktop Release / Build, Sign, Notarize
Fit to window
Zoom out
Zoom in

Annotations

14 errors
Test and Build / Build App
Canceling since a higher priority waiting request for ci-refs/pull/7922/merge exists
Test and Build / Build App
The operation was canceled.
Test and Build / Test (shard 2)
Canceling since a higher priority waiting request for ci-refs/pull/7922/merge exists
Test and Build / Test (shard 2)
The operation was canceled.
Test and Build / Test (shard 3)
Canceling since a higher priority waiting request for ci-refs/pull/7922/merge exists
Test and Build / Test (shard 3)
The operation was canceled.
Test and Build / Lint and Test
Canceling since a higher priority waiting request for ci-refs/pull/7922/merge exists
Test and Build / Lint and Test
The operation was canceled.
Test and Build / PostgreSQL integration (push)
Canceling since a higher priority waiting request for ci-refs/pull/7922/merge exists
Test and Build / PostgreSQL integration (push)
A task was canceled.
Test and Build / PostgreSQL integration (migrate)
Canceling since a higher priority waiting request for ci-refs/pull/7922/merge exists
Test and Build / PostgreSQL integration (migrate)
A task was canceled.
CI
Canceling since a higher priority waiting request for ci-refs/pull/7922/merge exists
CI
Canceling since a higher priority waiting request for ci-refs/pull/7922/merge exists